Serving Charlotte, Mooresville, Statesville, Huntersville, Cornelius and nearby.

LVP, laminate, hardwood and tile installation in Charlotte and the surrounding area. The job starts at the subfloor, where most failures begin, and ends at the baseboard.

[ The subfloor ]

704.flooringsolutions Staircase rebuild
Staircase stripped to the framing before new treads
Down to the structure
Stairs with old treads removed and a new board ready
Old treads out
New treads, stained
Installing
New unfinished oak boards on the stair landing
Landing, raw oak
Stair landing in stained oak seen from above
Landing, finished
Treads up close
Finished staircase with stained treads and white risers
Finished

Why the subfloor decides everything

Flooring installed over an uneven or damp subfloor will cause problems, and those problems may not show up on delivery day. They can show up six months later: a squeak underfoot, a buckled seam, or a gap opening up in a corner.

When that happens, there’s no small fix. The flooring has to be removed, the subfloor has to be corrected, and the flooring has to be installed again. That means paying for the same floor twice.

That’s why subfloor prep isn’t an add-on line on our quote. It’s part of the job. We check the level, correct whatever needs to be corrected, and only then do we install the flooring. More work up front means fewer problems later.

  • 4 Floor types installed
  • 5 Towns served
  • 3 Steps from message to finished floor
Text for a quote

Service area

  • Charlotte
  • Mooresville
  • Statesville
  • Huntersville
  • Cornelius
  • and nearby towns

Charlotte and the surrounding area, including Mooresville, Statesville, Huntersville, Cornelius and nearby towns.

If you're close to that and not sure, just ask (sends a text message). If you're too far out, I'll tell you right away instead of leaving you waiting on a callback.

[ Work ]

Recent jobs

  1. Long staircase finished in oak-look vinyl plank treads and risers, with a stained handrail Job LVP staircase Scope Treads, risers and matching stair nose Material Luxury vinyl plank LVP staircase 01 / 03
  2. Finished kitchen with a white quartz peninsula, greige cabinets and wide wood-look vinyl plank floor Job Kitchen remodel Scope Cabinets, quartz countertop, LVP floor Material Quartz, painted cabinets, LVP Kitchen remodel 02 / 03
  3. Finished laundry room with white shaker cabinets, a double sink and a black and white mosaic tile floor Job Laundry room Scope Cabinets, countertop, sink and tile floor Material Shaker cabinets, quartz, mosaic tile Laundry room 03 / 03

[ Services ]

What we do

Close-up of vinyl plank stair treads with matching rounded stair nose
Finished kitchen wall with greige cabinets, brass pulls and a wavy white tile backsplash
Accent wall with diagonal lattice trim painted navy blue
  • Flooring

    LVP, laminate, hardwood and tile, installed new or replacing what's already there. That includes tearing out the old floor, prepping and leveling the subfloor, and running stairs, which is the part that separates a clean job from an obvious one.

  • Trim and carpentry

    Baseboards, trim and finish carpentry. Cabinet installation. This is what closes a room out, and what makes the difference between finished and well finished.

  • Remodeling and repair

    Kitchen and bathroom remodels, general home remodeling, sheetrock and drywall, and the repairs that turn up along the way. If the floor is where a project starts, this is usually the rest of it.

Text for a quote
Straight-on view of a staircase finished in oak-look vinyl plank with matching stair nose

More work up front, none after.

[ Process ]

How it works

  1. 1. You reach out

    Send a message with rough square footage and a photo of the room. A phone photo is fine.

  2. 2. We come look

    We measure, check the subfloor and understand what you want. You get a firm quote, with no surprises later.

  3. 3. We schedule and I do the work

    Agreed date, job start to finish, and the house clean when I leave.

[ Clients ]

What clients say

Example — replace before launch

“We replaced the carpet throughout with LVP. He found a low spot in the living room another installer had ignored, fixed it before laying anything, and a year later there isn't a single squeak.”

Kristen Parker, Huntersville

Example — replace before launch

“Kitchen and bathroom in one project. On site when he said he would be, told us when something had to change, and left it clean every day.”

Megan Williams, Mooresville

Example — replace before launch

“The staircase was the part I was most worried about. It came out better than the rest of the house.”

Hanna Morgan, Charlotte

[ FAQ ]

Common questions

Finished kitchen with a quartz peninsula, brass faucet, greige cabinets and vinyl plank floor
What does it cost?

It depends on square footage, material and the condition of the subfloor. That's why I look before I quote. Forms of payment: Zelle, cash, check, Apple Pay and Cash App.

Do you supply the material?

We can provide the flooring material, or we can install materials you’ve already purchased. If you’re unsure about what to buy, our team can guide you toward the best flooring option for your home, with great quality and affordable pricing.

How long does it take?

A single room usually runs one to two days. A whole house depends on the square footage, and I'll give you the date when I quote.

Do I need to move out?

Usually not. We work room by room whenever the layout allows.

[ Get a quote ]

Send me a photo of the room.

That's enough for me to tell you whether the job is a fit and where to start.

Charlotte · Mooresville · Statesville · Huntersville · Cornelius